Back to Aquatic Systems Project Home Page
Appendix 1 Appendix 2
|
|
RIVER
DOWNSTREAM |
SENDERO
TRES RIO 450 |
SENDERO
TRES RIO 800 |
RIVER
UPSTREAM |
SURA
CREEK |
CAMINO
CIRC. LEJANO 550 |
CAMINO
CIRC. CERCANO 1000 |
SENDERO
ORIENTAL 350 |
|
|
beach
site |
STR
450 |
STR
800 |
suspended
bridge |
SUR
950 |
CCL
550 |
CCC
1000 |
SOR
350 |
|
pH |
7.5 |
6 |
6.5 |
7 |
7 |
7 |
7.5 |
6 |
|
Carbon
Dioxide(ppm) |
10 |
18 |
9 |
12 |
14 |
13 |
11 |
25 |
|
Phosphate
(ppm) |
less
than 1.0 |
less
than 1.0 |
none |
less
than 1.0 |
less
than 1.0 |
less
than 1.0 |
clear |
less
than 1.0 |
|
Total
Hardness (ppm) |
62 |
64 |
68 |
66 |
106 |
78 |
66 |
64 |
|
Conductivity
(mics) |
110 |
80 |
50 |
150 |
190 |
190 |
110 |
110 |